Agenda and minutes

Planning and Development - Thursday, 29th July, 2021 6.30 pm

Venue: Council Chamber, 13 Church Street, Clitheroe, BB7 2RA

Contact: Olwen Heap 

Items
No. Item

164.

Apologies for absence

Minutes:

Apologies for absence for the meeting were received from Councillors A Humphries and S O’Rourke.

 

165.

To approve the minutes of the previous meeting pdf icon PDF 240 KB

Minutes:

The minutes of the meeting held on 1 July 2021 were approved as a correct record and signed by the Chairman.

 

166.

Declarations of pecuniary and non pecuniary interests

Members are reminded of their responsibility to declare any pecuniary or non-pecuniary interest in respect of matters contained in the agenda.

Minutes:

Councillor K Horkin declared that he owned various businesses in Clitheroe.

 

167.

Public participation

Minutes:

There was no public participation.

168.

Planning Applications under the Town and Country Planning Act 1990 pdf icon PDF 106 KB

Report of the Director of Economic Development and Planning – copy enclosed

169.

Planning Application 3/2020/0667 - Whitcher Wells Fish Hatchers, Whitendale Road, Dunsop Bridge pdf icon PDF 324 KB

Minutes:

The Head of Planning Services reported upon amended plans that had been received from the applicant.

 

RESOLVED:

 

That the application be approved with the following conditions:-

 

Time limit, plans and details

 

1.         The development must be begun not later than the expiration of three years beginning with the date of this permission.

 

REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2.         Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings:

 

            Location Plan 1:5000

            5891bb01 Revision A Site Location Plan A4 received on 28/07/21;

            Site Plan As Existing (received 28.01.2021)

            5891 b/b/01 Floor Plans and Elevations as Existing

Existing Ground Floor Plan (Buildings A & B) (received 28.01.2021)

Existing First Floor Plan (Buildings A & B) (received 28.01.2021)

            Existing Roof Plan (Buildings A & B) (received 28.01.2021)

            Existing North Elevation (Buildings A & B) (received 28.01.2021)

            Existing East Elevation (Buildings A & B) (received 28.01.2021)

            Existing South Elevation (Buildings A & B) (received 28.01.2021)

            Existing West Elevation (Buildings A & B) (received 28.01.2021)

            Existing Long Section (received 28.01.2021)

     5891cb01 Revision D Site Plans, Floor Plans and Elevations as Proposed received on 28/07/21

5891 c/b/02 rev.B Elevations and Typical Section as Proposed (received 28.01.2021)

     

REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent.

 

3.         All the external works of the development hereby permitted shall be completed before the expiration of three years from the date of this permission.

 

REASON: In order that the Local Planning Authority retains effective control over the development and to ensure that there is no significant deterioration in the condition of the building.

 

4.         The existing buildings identified for demolition shall be demolished and all resultant materials removed from the site before development pursuant to this permission is commenced.

 

REASON: To safeguard the amenity of the locality.

 

5.         This permission shall relate to the proposed conversion in accordance with the Design and Access Statement and Condition Report by Mason Gillibrand Architects submitted as part of the application. Any deviation from the survey may need to be the subject of a further planning application.

 

REASON: Since the application is for the conversion of the building only.

 

6.         Notwithstanding the submitted details, precise specifications or samples of walling, door/window surrounds, rainwater goods, roofing/ridge materials including surfacing materials, their colour and texture shall have been submitted to and approved by the Local Planning Authority before their use in the proposed development. The development shall be completed in accordance with the approved details.

 

REASON: To ensure that the materials to be used are appropriate to the locality.

 

7.         The proposed roof lights shall be of Conservation Type, recessed with a flush fitting, and shall be retained as such in perpetuity.

 

REASON:  In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality.

 

8.         Full details of the alignment, height and appearance of any fences and walls and gates  ...  view the full minutes text for item 169.

170.

Planning Application 3/2021/0076 - Queen Mary Terrace and Bridge Terrace, Whalley pdf icon PDF 467 KB

Minutes:

The Head of Planning Services reported upon an improved offer on affordable units made by the applicant.

 

RESOLVED: That the application be DEFERRED and DELEGATED to the Director of Economic Development subject to a Section 106 Agreement within 3 months from the date of this Committee meeting or delegated to the Director of Planning in conjunction with the Chairperson and Vice Chairperson of Planning and Development Committee should exceptional circumstances exist beyond the period of 3 months subject to the following conditions:

 

1.            The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.

 

REASON:  Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 

 

2.            Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings:

 

      Plans  

            Affordable Housing Layout – B received on the 26/07/21 and letter received 26/07/21 indicating housing tenure.

            Boundary Treatment – Rev D

            Finished floor level - FFL-01B

            Materials – ML-01C

            Refuse – RL-01Br

            Sections SS-01B SS-02B

            Block Plan A&B – 200B

            Landscape 1,2,3&4 18544B

 

            House Types:

            Barton

            Barley Plus

            Croston

            Cleveley

            Edmonton

            Mawdesley

            Whalley

            Keighley

            Pattersley

     

            REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent hereby approved.

 

Materials

 

3.            The materials to be used on the external surfaces of the development hereby approved as indicated on drawing(s) ML-101C shall be implemented as indicated.

 

REASON:  In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality and respond positively to the inherent character of the area.     

 

Highways

 

4.            No part of the development hereby approved shall commence until a scheme for the construction of the site access and the off-site works of highway mitigation along with a timescale for their implementation has been submitted to, and approved in writing by, the Local Planning Authority. . Thereafter the site access and off-site works shall be completed in accordance with agreed timetable.

 

REASON: In order to satisfy the Local Planning Authority and Highway Authority that the final details of the highway scheme/works are acceptable before work commences on site.

 

5.            The new estate roads and accesses between the site and Mitton Road shall be constructed in accordance with Lancashire County Council's Specification for Construction of Estate Roads to at least base course level before any development takes place within the site.

 

      REASON: To ensure that satisfactory access is provided to the site before the development hereby permitted becomes operative.

 

6.            All garage facilities/ off street parking provision shall include provision of an electrical supply suitable for charging an electric motor vehicle.

 

      REASON: To support sustainable transport objectives and to contribute to a reduction in harmful vehicle emissions.

 

7.            None of the dwellings hereby approved shall be occupied until the estate roads which serve that dwelling have  ...  view the full minutes text for item 170.

171.

Planning Application 3/2021/0350 - Old Grammar School, Station Road, Whalley pdf icon PDF 479 KB

Minutes:

RESOLVED:

 

That the application be approved subject to the following conditions:

 

1.         The development must be begun not later than the expiration of three years beginning with the date of this permission.

 

REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2.       Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings:

     

   WHAL 01/Dwg 05

    WHAL 01/Dwg 02B

    WHAL 01/Dwg 04b

    WHAL 01/Dwg 00

 

    REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent

 

3.       In the event that any bats are found or disturbed during any part of the development/roofing work, all work shall cease until further advice has been sought from a licensed ecologist.

 

REASON: To ensure that in the event that any bats are present there will be no   adverse effects on the favourable conservation status of a bat population and bats will be protected from the damaging activities of development.

 

4.       Precise specifications of proposed attachment of the glazed screen to the historic fabric shall have been submitted to and approved in writing by the Local Planning Authority. Thereafter the glazed screen shall be attached to the building in accordance with the approved details.

 

          REASON: In order to safeguard the special architectural and historic interest of the listed building.

 

5.       Precise specifications (including a method statement and drawings) of proposed new doorway to the south elevation of the historic build and proposed window to the east elevation of the historic build shall have been submitted to and approved in writing by the Local Planning Authority before the implementation of these elements of the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

      REASON: In order to safeguard the special architectural and historic interest of the listed building in restoration of the doorway and window opening.

 

6.       Precise specifications and samples of proposed wall, roof, outdoor play area enclosure, window and door surround, window and door materials shall have been submitted to and approved in writing by the Local Planning Authority before their use in the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

      REASON: In order to safeguard the special architectural and historic interest of the listed building.

 

7.       Precise specifications (including drawings) of proposed new windows, doors, rooflights and outdoor play area framing shall have been submitted to and approved in writing by the Local Planning Authority before their use in the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

      REASON: In order to safeguard the special architectural and historic interest of the listed building.

 

8.       External timberwork shall be painted within one month of its installation and retained as such in perpetuity.

 

      REASON: In order to safeguard the special architectural and historic interest of the listed building.

 

Notes

 

1.         Cadent Gas advise that due to the presence of  ...  view the full minutes text for item 171.

172.

Planning Application 3/2021/0351 - Old Grammar School, Station Road, Whalley pdf icon PDF 423 KB

Minutes:

RESOLVED:

 

That the application be approved subject to the following conditions:

 

1.         The development must be begun not later than the expiration of three years beginning with the date of this permission.

 

REASON:  Required to be imposed pursuant to Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

 

2.       Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings:

     

          WHAL 01/Dwg 05

          WHAL 01/Dwg 02B

          WHAL 01/Dwg 04b

          WHAL 01/Dwg 00

 

          REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent.

 

3.       Precise specifications of proposed attachment of the glazed screen to the historic fabric shall have been submitted to and approved in writing by the Local Planning Authority. Thereafter the glazed screen shall be attached to the building in accordance with the approved details.

 

REASON:  In order to safeguard the special architectural and historic interest of the listed building.

 

4.       Precise specifications (including a method statement and drawings) of proposed new doorway to the south elevation of the historic build and proposed window to the east elevation of the historic build shall have been submitted to and approved in writing by the Local Planning Authority before the implementation of these elements of the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

          REASON:  In order to safeguard the special architectural and historic interest of the listed building in restoration of the doorway and window opening.

 

5.       Precise specifications and samples of proposed wall, roof, outdoor play area enclosure, window and door surround, window and door materials shall have been submitted to and approved in writing by the Local Planning Authority before their use in the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

      REASON:  In order to safeguard the special architectural and historic interest of the listed building.

 

6.       Precise specifications (including drawings) of proposed new windows, doors, rooflights and outdoor play area framing shall have been submitted to and approved in writing by the Local Planning Authority before their use in the proposed works. The development thereafter shall be implemented in accordance with the approved details.

 

          REASON:  In order to safeguard the special architectural and historic interest of the listed building.

 

7.       External timberwork shall be painted within one month of its installation and  retained as such in perpetuity.

 

      REASON:  In order to safeguard the special architectural and historic interest of the listed building.

 

8.       In the event that any bats are found or disturbed during any part of the development/roofing work, all work shall cease until further advice has been sought from a licensed ecologist.

 

          REASON: To ensure that in the event that any bats are present there will be no adverse effects on the favourable conservation status of a bat population and bats will be protected from the damaging activities of development.

 

Notes

 

1.   Further alteration  ...  view the full minutes text for item 172.

173.

Planning Application 3/2021/0332 - Clitheroe Golf Club pdf icon PDF 353 KB

Minutes:

The Head of Planning Services reported upon an additional letter received regarding the effectiveness of the net and responsibility for the stream.

 

RESOLVED:

 

That the application be deferred for further negotiation and to go back to Committee within 3 months.

 

(Mr D Johnson spoke in favour of the above application. Mr T Hayes spoke against the above application. Cllr D Birtwhistle was given permission to speak on the above application).

174.

Planning Application 3/2021/0493 - Atrium Cafe, Clitheroe Castle Museum pdf icon PDF 386 KB

Minutes:

The Head of Planning Services reported upon an amended condition.

 

RESOLVED:

 

That the application be approved subject to the following conditions:

 

1.            The development must be begun not later than the expiration of three years beginning with the date of this permission.

 

            REASON: Required to be imposed pursuant to Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

 

2.            The permission shall relate to the development as shown on Plan Reference:

 

Café-Ramp Sheet 1 (14 July 2021)

            Location Plan (14 May 2021)

 

REASON: For the avoidance of doubt and to ensure that the development is carried out in accordance with the submitted plans.

 

3.            Precise specifications and samples of the millboard decking shall have been submitted to and approved by the Local Planning Authority before their use in the proposed works.

 

REASON: In order to safeguard the special architectural and historic interest of the listed building.

175.

Planning Application 3/2021/0555 - 42 Knowsley Road, Wilpshire pdf icon PDF 336 KB

Minutes:

RESOLVED:

 

That committee be minded to approve the application and deferred and delegated to Head of Planning Services for additional conditions.

 

(Mr M Twiname spoke in favour of the above application. Mr M Edwards spoke against the above application).

176.

Planning Application 3/2021/0488 - TMG Sports Vehicles Building D, Mitton Road Bus Park, Whalley pdf icon PDF 261 KB

Minutes:

The Head of Planning Services reported upon additional information received from an objector.

 

RESOLVED:

 

That committee be minded to approve the application and deferred and delegated to Head of Planning Services in consultation with chair and vice chair for appropriate conditions including temporary consent for a period of 12 -18 months and noise attenuation measures.

 

(Mr T Grimes spoke in favour of the above application).

177.

Planning Application 3/2020/1059 - Stanley House, Mellor pdf icon PDF 399 KB

Minutes:

RESOLVED:

 

That the application be DEFERRED and DELEGATED to the Director of Economic Development and Planning subject to departure procedures and to the imposition of appropriate conditions within 3 months from the date of this Committee meeting or delegated to the Director of Economic Development and Planning in conjunction with the Chairperson and Vice Chairperson of Planning and Development Committee should exceptional circumstances exist beyond the period of 3 months.

 

Time Scale for Implementation of Consent  

 

1.         The development hereby permitted shall be commenced before the expiration of three years from the date hereof.

 

            REASON: Imposed In accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990.

 

Approved Plans and Documents 

 

2.         The development hereby permitted shall not be carried out otherwise than in conformity with the following submitted plans and details and recommendations therein received by the Local Planning Authority:

 

Site Plans

 

20.105.001B – SITE- existing site plan

20.105.002C – SITE- proposed site plan & areas

20.105.003E – SITE- proposed site plan received on 19/07/21

20.105.004A – SITE- new development comparison

20.105.005A – SITE- site modelling

20.105.006A – SITE- OS plan received on 05/07/21

 

Spa

 

20.105.01.007C – SPA- proposed elevations 1 of 4

20.105.01.008C – SPA- proposed elevations 2 of 4

20.105.01.009C – SPA- proposed elevations 3 of 4

20.105.01.010B – SPA- proposed elevations 1 of 4

20.105.01.011B – SPA- proposed ground floor plan

20.105.01.012B – SPA- proposed first floor plan

20.105.01.013A – SPA- roof plan

20.105.01.014A – SPA- perspectives

 

Bedroom Wing

 

20.105.02.001A – BEDROOMS - proposed lower ground floor and ground floor plans

20.105.02.002A – BEDROOMS -proposed first floor plan

20.105.02.003B – BEDROOMS -proposed elevations 1 of 2

20.105.02.004B – BEDROOMS -proposed elevations 2 of 2

20.105.02.005A – BEDROOMS -existing floor plans

20.105.02.006A – BEDROOMS -existing elevations 1 of 2

20.105.02.007A – BEDROOMS -existing elevations 2 of 2

20.105.02.008A – BEDROOMS - roof plan

20.105.02.009A – BEDROOMS - perspectives

Barn

 

20.105.03.001A – BARN- existing plans

20.105.03.002A – BARN- existing elevations

20.105.03.003A – BARN- proposed ground floor plan

20.105.03.004A – BARN- proposed first floor plan

20.105.03.005B – BARN- proposed elevations

20.105.03.006A – BARN– roof plan

20.105.03.007A – BARN– perspectives

 

Landscape

Landscape Softworks Plan Rev B – DEP

Landscape Masterplan Rev C – DEP

·         Arboricultural Report – DEP

·         Biodiversity Enhancements Appraisal – Rural Solutions 

·         Design and Access Statement – Campbell Driver Partnership

·         Heritage Statement – Hinchliffe Heritage

·         Landscape Visual Statement – DEP

·         Landscape Strategy – DEP

·         Preliminary Ecology Appraisal - Rural Solutions 

·         Planning Statement – Rural Solutions

·         Transport Assessment – Dynamic Transport Planning

·         Travel Plan – Dynamic Transport Planning 

 

Materials 

 

3.         Prior to their use in the development details of the following shall be submitted to and agreed in writing by the Local Planning Authority:

 

·         Samples of all external walling materials

·         Samples of all external roofing materials

·         Details of all window and door frame materials and finishes 

·         Rainwater goods

           

Thereafter the development shall be carried out in accordance with the approved details.

 

            REASON: To ensure a satisfactory standard of development and finish for the extension of  ...  view the full minutes text for item 177.

178.

Planning Application 3/2020/1060 - Stanley House, Mellor pdf icon PDF 345 KB

Minutes:

RESOLVED:

 

That Listed Building Consent be granted subject to the following conditions:

 

Time Scale for Implementation of Consent  

 

1.         The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.

REASON:  Required to be imposed pursuant to Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

 

Approved Plans and Documents 

 

2.         The development hereby permitted shall not be carried out otherwise than in conformity with the following submitted plans and details and recommendations therein received by the Local Planning Authority:

 

Site Plans

 

20.105.001B – SITE- existing site plan

20.105.002C – SITE- proposed site plan & areas

20.105.003E – SITE- proposed site plan received on 19/07/21

20.105.004A – SITE- new development comparison

20.105.005A – SITE- OS plan received on 5/07/21

 

Spa

 

20.105.01.007C – SPA- proposed elevations 1 of 4

20.105.01.008C – SPA- proposed elevations 2 of 4

20.105.01.009C – SPA- proposed elevations 3 of 4

20.105.01.010B – SPA- proposed elevations 1 of 4

20.105.01.011B – SPA- proposed ground floor plan

20.105.01.012B – SPA- proposed first floor plan

20.105.01.013A – SPA- roof plan

20.105.01.014A – SPA- perspectives

 

Bedroom Wing

 

20.105.02.001A – BEDROOMS - proposed lower ground floor and ground floor plans

20.105.02.002A – BEDROOMS -proposed first floor plan

20.105.02.003B – BEDROOMS -proposed elevations 1 of 2

20.105.02.004B – BEDROOMS -proposed elevations 2 of 2

20.105.02.005A – BEDROOMS -existing floor plans

20.105.02.006A – BEDROOMS -existing elevations 1 of 2

20.105.02.007A – BEDROOMS -existing elevations 2 of 2

20.105.02.008A – BEDROOMS - roof plan

20.105.02.009A – BEDROOMS - perspectives

 

Barn

 

20.105.03.001A – BARN- existing plans

20.105.03.002A – BARN- existing elevations

20.105.03.003A – BARN- proposed ground floor plan

20.105.03.004A – BARN- proposed first floor plan

20.105.03.005B – BARN- proposed elevations

20.105.03.006A – BARN– roof plan

20.105.03.007A – BARN– perspectives

 

Landscape

Landscape Softworks Plan Rev B – DEP

Landscape Masterplan Rev C – DEP

·         Arboricultural Report – DEP

·         Biodiversity Enhancements Appraisal – Rural Solutions 

·         Design and Access Statement – Campbell Driver Partnership

·         Heritage Statement – Hinchliffe Heritage

·         Landscape Visual Statement – DEP

·         Landscape Strategy – DEP

·         Preliminary Ecology Appraisal - Rural Solutions 

·         Planning Statement – Rural Solutions

·         Transport Assessment – Dynamic Transport Planning

·         Travel Plan – Dynamic Transport Planning 

 

Materials 

 

3.         Prior to their use in the development details of the following shall be submitted to and agreed in writing by the Local Planning Authority:

 

·         Samples of all external walling materials

·         Samples of all external roofing materials

·         Car parking materials

·         Details of all window and door frame materials and finishes 

·         Rainwater goods

           

Thereafter the development shall be carried out in accordance with the approved details.

 

            REASON: To ensure a satisfactory standard of development and finish for the extension of this the host Grade II* heritage asset.

179.

Longridge Cricket Club Section 106 Monies pdf icon PDF 133 KB

Report of Director of Economic Development and Planning enclosed.

Minutes:

The Director of Economic Development and Planning submitted a report seeking authority from members to release Section 106 contributions to Longridge Cricket Club.

 

The Section 106 monies were secured when planning permission was granted to erect up to 195 dwellings on land to the North of Dilworth Lane, Longridge in the sum of £682 per dwelling towards off site open space for:-

 

·         Grass pitch improvements at Mardale, Longridge;

·         Cricket wicket provision at Longridge Cricket Club;

·         Sports hall improvements at Longridge Sports Club; and

·         Play facility improvements in Longridge.

 

To date £87,774 had been receipted in respect of the contribution based on the three trigger points set out in the Agreement.

 

The Director of Economic Development and Planning reported that Longridge Cricket Club had recently done improvements works at the club in respect of the cricket pitches including reseeding and treating the pitch and were seeking to utilise part of the S106 contributions to fund the work. Invoices totalling £12,753 had been received and approved.

 

RESOLVED THAT COMMITTEE:

 

Authorise the payment of the already received invoice(s) from Longridge Cricket Club within 28 working days of committee, up to the amount of £12,753.

180.

Strategic Housing and Employment Land Study - Consultancy Support pdf icon PDF 149 KB

Report of Director of Economic Development and Planning enclosed.

Minutes:

The Director of Economic Development and Planning submitted a report asking for committee’s approval to have consultancy support to deliver key evidence for the Local Plan Review, specifically for the Strategic Housing and Employment Land Study (SHELA)

 

The SHELA (as was the SHLAA) is a key piece of evidence that helps identify potential sources of land to enable the Council to ensure it has land available to deliver its strategy and housing requirements. These sites would still need to follow the due process of either Local Plan allocation and/or the granting of planning permission. The most recent guidance has included the consideration of employment sites as well as housing sites, hence the term SHELA.

 

The Council is required to publish an up-to-date study as part of the plan-making process and to meet national policy requirements. A new study is needed as the last update was 2013, and the Council needs to be able to demonstrate that it has considered reasonable alternatives in relation to development strategy patterns of development and potential sites.

 

Members were reminded that this piece of work was to be delivered by in-house resource, however, ongoing staffing issues meant that there was a need to secure consultancy support to deliver the SHELA to maintain the published timetable. At this stage there was no requirement to identify additional funding as the current Local Plan budget has resources available.

 

RESOLVED THAT COMMITTEE:

 

1.    Agree to secure consultancy support to deliver the Strategic Housing and Employment Land Study and that the appointment of a suitable consultancy be commissioned as soon as possible, having regard to the Council’s financial and procurement regulations; and

 

2.      Endorse the publication of a call for sites to inform the Local Plan process and that the call for sites process be kept under review by the Development Plan working group.

181.

Strategic Housing and Employment Needs Assessment (SHENA) pdf icon PDF 284 KB

Report of Director of Economic Development and Planning enclosed.

Minutes:

The Director of Economic Development and Planning submitted a report asking committee to agree to the publication of the final report of April 2020 carried out by Turley Associates on the Strategic Housing and Employment Needs Assessment.

 

The report, which provides a range of housing data, would be published for reference but its findings in relation to housing requirement would remain subject to further scenario development as part of the plan-making process.

 

RESOLVED THAT COMMITTEE:

 

Agree to the publication of the consultant’s final report which provides the basis for further scenario development to assist the plan-making process.

182.

Local Development Framework - Annual Monitoring Report 2020/21 pdf icon PDF 149 KB

Report of Director of Economic Development and Planning enclosed.

Minutes:

The Director of Economic Development and Planning submitted the Authority Monitoring Report 2020/21 for committee’s information. The Council would continue to monitor on an annual basis and would look to develop an improved system as part of the forthcoming Local Plan review.

183.

Appeals (if any) pdf icon PDF 32 KB

Appeals update.

 

i)              3/2020/1085 – construction of a pair of semi-detached bungalows with associated gardens and parking areas at Land at Bank Cottages, Billington, BB7 9NL – appeal dismissed.

 

ii)             3/2020/1070 – division of one house into two dwellings. No extension or increase in accommodation proposed at Roall Garth, Hesketh Lane, Chipping, PR3 2TH – appeal dismissed.

 

iii)           3/2021/0237 – raising of roof to dormer bungalow to create full two storey dwelling and alteration to parking arrangements at 3 Moor Field, Whalley, BB7 9SA – appeal dismissed.

 

iv)           3/2020/0367 – change of use and extension into residential dwellings and associated landscaping and dwellings at Black Horse Inn, Pimlico, Clitheroe, BB7 4PZ – appeal dismissed.

Additional documents:

Minutes:

i)              3/2020/1085 – construction of a pair of semi-detached bungalows with associated gardens and parking areas at Land at Bank Cottages, Billington, BB7 9NL – appeal dismissed.

 

ii)             3/2020/1070 – division of one house into two dwellings. No extension or increase in accommodation proposed at Roall Garth, Hesketh Lane, Chipping, PR3 2TH – appeal dismissed.

 

iii)           3/2021/0237 – raising of roof to dormer bungalow to create full two storey dwelling and alteration to parking arrangements at 3 Moor Field, Whalley, BB7 9SA – appeal dismissed.

 

iv)               3/2020/0367 – change of use and extension into residential dwellings and associated landscaping and dwellings at Black Horse Inn, Pimlico, Clitheroe, BB7 4PZ – appeal dismissed.

184.

Reports from representatives on outside bodies

None.

Minutes:

There were no reports from representatives on outside bodies.

185.

Exclusion of Press and Public

None.

Minutes:

There were no items under this heading.